Development of AIM Method Planning of Inbound Material Handling Processes

Authors

  • Zs. Barta Budapest University of Technology and Economics Faculty of Transportation Engeneering Department of Transport Technology
  • K. Bóna Budapest University of Technology and Economics Faculty of Transportation Engeneering Department of Transport Technology

Keywords:

material flow, time necessity, AIM tables, planning

Abstract

The study shows the detailed examination of the AIM tables, a tool that helps the logistics system planning phase by calculating the needed time for each material handling processes. The method needed a revision because  the tables were made 50 years ago, and a lot of changes have been made by the technological development. The study shows some possible acts and further ideas to update and develop the method to help the system planner better.

Downloads

Download data is not yet available.

Downloads

Published

2010-12-01

How to Cite

Barta, Z., & Bóna, K. (2010). Development of AIM Method Planning of Inbound Material Handling Processes. Acta Technica Jaurinensis, 3(3), pp. 285–299. Retrieved from https://acta.sze.hu/index.php/acta/article/view/79

Issue

Section

Transportation Science, Logistics and Agricultural Engineering